Overall thirty (30) years experience in the field of Power Plant, Refinery Utilities Operation and Job Skills Training & Career development. Details as follows.
Jan. 01, 1974 – July 07, 1980 Pakistan Atomic Energy Commission at Karachi Nuclear Power plant (KANUPP)

137 MWe Steam Turbine and its Auxiliary systems Operation, e.g. Steam Boilers, Condensate water system, cooling water system, child water system, Nuclear reactor auxiliary systems and all other 106 numbers of Nuclear & conventional Power plant operating systems. 

More than twenty three (23) years continues service (July 08, 1980 to Dec.31, 2003) with Aramco Riyadh Refinery. Details as follows.
July 08, 1980 to August 1995 Pertomin Riyadh Refinery 
(Utilities & Oil Movement Division.)
Worked since the commissioning of RRD Utilities plant e.g. Power Generation & Distribution, High Pressure Steam Generation & Distribution, Water Treatment (Reverse Osmosis & Ion Exchange), and Fuel storage facilities, Cooling Water/ Air and all other Refinery Utilities Systems. Major Job tasks were as follows.

•Advisor to Superintendent Utilities for the Operation and required Maintenance of 3x37.22 MVA and 2x14.5 MVA Gas Turbine power Generation Plant, 3x102 Tons/hrs and 2x45 Tons/hrs, medium and high pressure steam boilers and related axillaries. 
••Achievements.
•Commissioning of Riyadh Refinery Electrical Power Generation and Distribution Systems including SCECO incoming system. Technical review of several upcoming projects.
•Developed Utilities and Water Treatment Plant Operating procedures and Refinery Instruction Manuals (RRIMs).

•Developed and deployed RRD Boilers Steam Generation & Distribution System 
In-House training Course.
•Developed RRD Power Generation & Distribution System In-House training Course.
•Developed and deployed RRD Orientation to PDPs, CDPNEs, Transfer-in 
And Apprentices etc.